Complete road closure on Vértesi Road in Debrecen

Local News

Construction of a power line is ongoing on Vértesi Road. The work is progressing according to the planned schedule. Starting from February 3, the construction will continue with a full road closure.

As part of the infrastructure development, the water utility pipeline construction on István Street has reached its final stage, with a completion deadline of February 20, 2025, according to the contractor’s information. However, unforeseen circumstances (e.g., weather difficulties, discovered soil conditions) may affect the project timeline.

In parallel, the construction of a power line is also taking place on Vértesi Road. The work is proceeding as scheduled, with a full road closure in place starting February 3.

The section between the southern entrance road to the wastewater treatment plant and Basahalom Street will be fully closed during construction. The work began on February 3, 2025 (Monday) and is expected to continue until June 30, 2025.

To access the AKSD Ltd. Regional Waste Treatment Plant, the route via Main Road 4 – Szováti Road – Sárga Dűlő – landfill access road should be used. Road signs and yellow direction boards will be placed at the affected intersections to indicate the road closure and diversion routes.

The Debrecen local government requests that drivers pay extra attention and follow the temporary traffic regulations on the affected road sections.

(Debreceni Nap)

 

Iris Properties

- Renewed flat on Jerikó Street

54 m2 flat for rent
200 000 Ft

- Studio flat on Bem tér

35 m2 flat for rent
190 000 Ft

- Homy flat near to tramline

40 m2 flat for rent
220 000 Ft

- Two rooms flat on Görgey

54 m2 flat for rent
230 000 Ft

- Sunny flat in the Center

53 m2 flat for rent
230 000 Ft

Leave a Reply

Your email address will not be published. Required fields are marked *